Record Detail
Advanced Search
Text
Rencana kerja dan syarat-syarat dan volume pekerjaan struktur grizzly : Pekerjaan studi penyelidikan geoteknik dan detail desain dermaga, jalan akses, grizzly, areal stockyard & red mud pond di kawasan pertambangan nikel pulau pakal kabupaten halmahera timur provinsi maluku utara
Description Not Available
Availability
2019090366 | 533-07-A 622.3 ANT p | My Library | Available |
Detail Information
Series Title |
-
|
---|---|
Call Number |
533-07-A 622.3 ANT p
|
Publisher | PT. Aneka Tambang : Jakarta., 2007 |
Collation |
90 hlm.; ilus.; 30 cm. + lamp.
|
Language |
Indonesia
|
ISBN/ISSN |
-
|
Classification |
622.3
|
Content Type |
text
|
Media Type |
unmediated
|
---|---|
Carrier Type |
volume
|
Edition |
-
|
Subject(s) | |
Specific Detail Info |
-
|
Statement of Responsibility |
Aneka Tambang
|
Other version/related
No other version available