Record Detail
Advanced Search
Text
Drilling proposal, momong prospect block 4, PT Antam Barisan Mining contract of work area EMR 84/87
A drilling proposal for seven diamond core holes totalling approximately 2000 metres is presented. The aim of the proposed programme is to further test the mineralization encountered in previous drill holes MOD001 and MOD002 and to test the possibility of high grade structurally controlled ore shoots. Fences of holes are proposed to provide geological cross-sections across the main area of interest.
Availability
2018091091 | My Library | Available |
Detail Information
Series Title |
-
|
---|---|
Call Number |
476-87-A 622.23 HEL d
|
Publisher | Minerals Exploration and Development Group : Sydney., 1987 |
Collation |
5 hlm. ; ilus. : 30 cm + lamp.
|
Language |
English
|
ISBN/ISSN |
-
|
Classification |
622.23
|
Content Type |
text
|
Media Type |
unmediated
|
---|---|
Carrier Type |
volume
|
Edition |
-
|
Subject(s) | |
Specific Detail Info |
-
|
Statement of Responsibility |
P.L. Hellman
|
Other version/related
No other version available